As part of the Hambantota Sea Port Development Project, three berths are to be constructed inside the Karagan Lawaya Lagoon. Phase-I includes the construction of quays; the construction of the cofferdam between two sets of berths; and the dredging of the lagoon in the Basin and Channel area.
GeoTech Limited - Hambantota Seaport Development – Phase I

Client

Sri Lanka Ports Authority

Date / Period

November 2006 to January 2007

Scope / Work Done

19 nos of boreholes drilled on and off-shore and covered quay, basin, and channel areas.